MCC and switchboard installation for WA mining sites.

MPEC supports motor control centre and switchboard installation work for mining and resources projects. The focus is on a clear scope, practical site coordination, installation quality and documented handover.

EC15765 Electrical Contractor LicenceABN 29 667 481 692WA Mining & Resources

MCC and switchboard work

01

Motor control centre installation and integration work.

02

High and low voltage switchboard installation on live and de-energised systems.

03

Testing and commissioning support within the approved project scope.

04

Control wiring, terminal work and interface coordination.

05

Containerised switchroom and fixed-plant electrical installation support.

06

Site documentation inputs and close-out coordination.

Built around the installation sequence.

Switchboard and MCC work has multiple interfaces: drawings, equipment access, cable routes, controls and commissioning. MPEC uses the project brief to understand those interfaces before mobilising a crew.

Build a Project Brief

What project teams ask first.

FAQ / 01

Can MPEC support MCC testing and commissioning?

MPEC’s stated scope includes MCC and switchboard installation, testing and commissioning support. Provide the specific test, commissioning and handover requirements in the Project Brief.

FAQ / 02

Does MPEC work on both high and low voltage switchboards?

MPEC’s public service scope includes high and low voltage switchboard work. The project brief should set out the specific equipment, access and scope requirements for review.

FAQ / 03

What should a switchboard enquiry include?

Include the site, equipment type, drawings or schedules, current project stage, required timing and key interfaces with other trades or commissioning teams.